Coordinate Greenville Site Plan Review for a Poolside Retaining Wall

Coordinate pool and retaining wall drawings for City of Greenville review, confirm permit issuance requirements, and track revisions across both designs.

Editorial desk   ·   2026-11-24
a wooden deck with chairs and umbrellas next to a swimming pool
Photo by Dinuka Lankaloka on Unsplash

Show the wall alignment and pool deck edge together

Start both designs from the same base drawing. Show the fiberglass shell, deck edge, retaining wall alignment and nearby property lines. If the wall turns toward the pool at the end of the patio, label that corner on both sets of drawings and have both designers confirm that their dimensions agree. Ask the City of Greenville Building & Permit Center how it wants the coordinated drawings submitted.

Schedule around Site Plan Permit issuance

Under Section 19-2.3.9, development or redevelopment of a structure or parcel within the City of Greenville requires issuance of a Site Plan Permit before any other building or construction-related permit can be issued. Ask the Building & Permit Center whether your residential pool and wall project falls under that provision. The city also says it can issue a Retaining Wall Permit only after approval of a complete review of the walls and their relationship to the site.

Keep both drawing sets current

Put one person in charge of reconciling reviewer comments. If a wall revision narrows the deck, have that person list the affected sheets, confirm the new layout with both designers and circulate matching revisions. Record each submission and each permit issuance as separate milestones. Use the coordinated layout and applicable permit dates to schedule the shell order and line up crews.