Give the electrician one equipment list
Before the office prepares the residential pool filing, send the electrician a dated list of the selected pump, lighting, controls and any heater included in the job. Include the equipment layout and flag selections still open. Charleston's residential pool guidance requires a separate electrical subpermit for associated pool equipment and prohibits adding a new electrical meter for the pool. Have the electrician flag any service questions while the estimate and equipment selections can still be revised.
Assign each filing to a person
Charleston's guidance lists both the Residential Alterations/Additions Application and the Electrical Permit Application. Put an owner beside each filing in your job tracker. Have the permit coordinator record the project address, equipment list revision, filing status and record numbers as they become available. Ask the Permit Center how it wants the filings associated if that is unclear. Give the superintendent access to both statuses so a milestone on the pool filing does not get read as a milestone on the electrical filing.
Reconcile late changes across both scopes
If the owner adds a light after the electrician has reviewed the package, send the revised equipment list to the electrician and the permit coordinator together. Have them identify which quote or filing details need attention. Record the disposition next to the new revision and replace the superseded list in the field packet before the crew schedules work around it.