Sketch two options on the same lot plan
When the septic layout is missing, give your builder room to compare two provisional pool designs. On a copy of the lot plan, have the builder draw the shell, deck, equipment pad and delivery route for each option. Add any septic locations shown in records and label them as unverified until they can be checked. Keep the shell size and delivery date open while you compare the options.
Ask for a dated sketch of the septic system
The South Carolina Department of Environmental Services (SCDES) directs homeowners who want an existing system inspected to hire a licensed septic system professional. Share both pool layouts and confirm whether the professional can document the tank, drainfield and any other components or boundaries that could affect the work. Request a dated sketch that clearly marks what was verified and what remains uncertain.
Get a layout decision before ordering
Suppose the drainfield turns out to occupy the side lawn planned for shell delivery. Ask the builder to compare the driveway-side option for deck space, the walk from the house and shell sizes that fit. Have the builder and septic professional review the shell, deck, equipment pad and delivery route for both options. Take questions about required separations and approvals to SCDES and the permitting office serving the property. Ask the builder to identify the workable layout and list any remaining checks or approvals before ordering the shell or booking delivery.
