SC811 Locates for Landscaping After a Pool Install

Walk the remaining digging areas with the landscape lead and give the crew a dated sketch. Have the company doing the excavation submit the SC811 locate notice, assign someone to confirm every operator has responded, and hold digging where a response or private locate is still pending.

Editorial desk   ·   2026-11-24
a wooden deck with chairs and umbrellas next to a swimming pool
Photo by Dinuka Lankaloka on Unsplash

Sketch the remaining digging areas

After the fiberglass pool is installed, walk the yard with the landscape lead and sketch where the crew plans to dig. Include planting holes, edging, and irrigation trenches if they are in scope. As a field practice, date the sketch and use fixed points such as the patio edge or equipment pad so the crew can match each area to the yard. SC811 lists landscaping among the projects for which crews should contact SC811 before digging. [SC811 Homeowner FAQs](https://sc811.com/homeowners/faqs-homeowners/)

Arrange private locating where needed

Review the sketch with the pool and landscape trades and ask where they installed buried lines, such as an irrigation feed or a line serving pool equipment. SC811 says utility companies mark the lines they install and maintain and points readers to private locators for privately installed lines. As a field practice, assign someone to arrange any private locate and record its status and the areas it covers. [SC811 General FAQs](https://sc811.com/faqs/) · [SC811 Homeowner FAQs](https://sc811.com/homeowners/faqs-homeowners/)

Submit the SC811 ticket and check Positive Response

The company doing the landscaping excavation should submit the SC811 locate notice for that work. Record its ticket number and assign someone on that crew to compare the ticket’s work area with the latest sketch and check Positive Response before digging. The checker should confirm that every facility operator listed on the ticket has responded. For a normal locate request, operators have three full working days to respond, excluding the day the request was entered, weekends, and holidays. If any operator has yet to respond after those three full working days, the checker should verify the notice details and contact SC811 to have that operator re-notified. [SC811 Homeowner FAQs](https://sc811.com/homeowners/faqs-homeowners/) · [SC811 General FAQs](https://sc811.com/faqs/)

Flag areas where digging must wait

As a field practice, give the landscape lead one dated handoff with the digging sketch, the excavating company’s ticket number, the name of the Positive Response checker, and the private locate contact and status. Flag each area with an outstanding operator response or private locate. Tell the crew to hold digging in those areas until the outstanding items are resolved, and name who will confirm that to the crew.