Skip to content
Porch & Plunge
Standard editorial article   /   South Carolina

What a Beachfront Acknowledgment Records About Your Pool Project

Check when South Carolina requires beachfront pool notification, what the plat must show and which records to keep before work starts.

Editorial desk   ·   2026-11-24
a wooden deck with chairs and umbrellas next to a swimming pool
Photo by Dinuka Lankaloka on Unsplash

Check whether the pool location calls for notification

Within South Carolina’s beachfront critical areas, the state lists construction and replacement of pools landward of both the baseline and an existing functional erosion control structure or device as activities requiring notification. Ask the South Carolina Department of Environmental Services Bureau of Coastal Management to confirm whether that process applies to your parcel and proposed pool location.

Document the old pool before removal

The submission requires a plat, a drawing of the property that locates the existing erosion control structure and shows the proposed pool’s footprint from above and its cross section, a cut-through view of its profile. For a replacement, the plat must show both views of the original pool as well. If a rounded fiberglass shell will replace a rectangular pool, have the existing pool documented before removal and flag any part of the new outline that extends closer to the structure.

File the letter with the submitted plat

Submit through ePermitting using the BCM Critical Area Activities form. The Beachfront Management Section reviews the submission and sends an acknowledgment letter if approved. Save the letter with the specific plat you submitted. If the pool moves to preserve a patio, ask the bureau whether the revised plat needs another review. Confirm any separate approvals with your local permitting office before work begins.

Sources