Write a Change-Order Entry for a Private Line on a South Carolina Pool Job

Write a pool change order that records a private utility crossing, the revised trench route, the price, and the customer’s approval.

Editorial desk   ·   2026-11-24
a wooden deck with chairs and umbrellas next to a swimming pool
Photo by Dinuka Lankaloka on Unsplash

Open a pending item when the owner flags a line

The homeowner mentions that the detached garage has power, and your equipment trench is drawn across the lawn between the buildings. Open a pending log item with the date, the owner’s observation and the drawing revision. Hold the affected trench work and treat the route as suspected until a private locator documents it. SC811 identifies detached-garage electrical feeds as an example of private lines outside standard utility marking and points builders to contract locators.

Record the crossing and the agreed change

Attach the locator’s report and a dated sketch showing the crossing against the original trench. A completed entry might read as follows. The private locator found the garage feed crossing the proposed equipment trench near the side gate. Reroute the trench along the patio as shown on drawing P-2, revision C. The fixed price increases by $450 and the equipment hookup moves one working day later. The customer signed the change order on May 7.

Release the revised scope after approval

Put the revised scope, price or agreed pricing basis, and schedule impact in writing. Document customer authorization through the contract’s change-order process before releasing affected work. Have the excavator verify that the locate notice covers the revised area and ask SC811 how to update the notice if coverage changes. If the option involves work on the garage feed itself, refer it to a qualified electrical contractor and confirm permit requirements with the local permitting authority. Give the foreman and affected trades the approved drawing before work resumes.